{"id":5318,"date":"2017-09-13T14:58:26","date_gmt":"2017-09-13T14:58:26","guid":{"rendered":"http:\/\/nb.ieb.kit.edu\/?p=5318"},"modified":"2017-09-13T15:00:57","modified_gmt":"2017-09-13T15:00:57","slug":"prefabrication-of-umar-urban-mining-and-recycling-has-started","status":"publish","type":"post","link":"https:\/\/nb.ieb.kit.edu\/index.php\/prefabrication-of-umar-urban-mining-and-recycling-has-started\/","title":{"rendered":"Prefabrication of UMAR &#8216;Urban Mining and Recycling&#8217; has started"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-5319 size-medium\" src=\"http:\/\/nb.ieb.kit.edu\/wp-content\/uploads\/2017\/09\/UMAR-Construction-537x251.jpg\" alt=\"\" width=\"537\" height=\"251\" srcset=\"https:\/\/nb.ieb.kit.edu\/wp-content\/uploads\/2017\/09\/UMAR-Construction-537x251.jpg 537w, https:\/\/nb.ieb.kit.edu\/wp-content\/uploads\/2017\/09\/UMAR-Construction-212x99.jpg 212w, https:\/\/nb.ieb.kit.edu\/wp-content\/uploads\/2017\/09\/UMAR-Construction-768x359.jpg 768w, https:\/\/nb.ieb.kit.edu\/wp-content\/uploads\/2017\/09\/UMAR-Construction-1024x479.jpg 1024w\" sizes=\"(max-width: 537px) 100vw, 537px\" \/><\/p>\n<p>On September 4th, the prefabrication of all 7 modules of NEST unit UMAR has started at the facilities of general contractor kaufmann zimmerei und tischlerei gmbh in Reuthe, Austria. The building, designed by Werner Sobek with Dirk E. Hebel and Felix Heisel in collaboration with a multitude of academic and industrial partners, aims to prove the feasibility of the circular approach for the building industry. For more information, please click <a href=\"http:\/\/nb.ieb.kit.edu\/?cat=32\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On September 4th, the prefabrication of all 7 modules of NEST unit UMAR has started at the facilities of general contractor kaufmann zimmerei und tischlerei gmbh in Reuthe, Austria. The building, designed by Werner Sobek with Dirk E. Hebel and Felix Heisel in collaboration with a multitude of academic and industrial partners, aims to prove [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false,"jetpack_publicize_feature_enabled":true},"categories":[2],"tags":[],"jetpack_featured_media_url":"","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p8IIze-1nM","_links":{"self":[{"href":"https:\/\/nb.ieb.kit.edu\/index.php\/wp-json\/wp\/v2\/posts\/5318"}],"collection":[{"href":"https:\/\/nb.ieb.kit.edu\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nb.ieb.kit.edu\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nb.ieb.kit.edu\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nb.ieb.kit.edu\/index.php\/wp-json\/wp\/v2\/comments?post=5318"}],"version-history":[{"count":4,"href":"https:\/\/nb.ieb.kit.edu\/index.php\/wp-json\/wp\/v2\/posts\/5318\/revisions"}],"predecessor-version":[{"id":5323,"href":"https:\/\/nb.ieb.kit.edu\/index.php\/wp-json\/wp\/v2\/posts\/5318\/revisions\/5323"}],"wp:attachment":[{"href":"https:\/\/nb.ieb.kit.edu\/index.php\/wp-json\/wp\/v2\/media?parent=5318"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nb.ieb.kit.edu\/index.php\/wp-json\/wp\/v2\/categories?post=5318"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nb.ieb.kit.edu\/index.php\/wp-json\/wp\/v2\/tags?post=5318"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}