First encounter with `Building for Disassembly`
As a first encounter with the studio theme of `Building for Disassembly`, students took 24 hours to dismantle a car in its 5000 single pieces. While doing so, an investigation started in order to understand which construction and connection principles are adequate for a disassembly approach and could be transferred into an architectural design process. Walter Haase of Werner Sobek`s Insitute of Lightweight Design and Construction ILEK at the University of Stuttgart, gave impressions of their current research approaches in the field and showed the potentials for the building industry. Directly after the dismanteling happened, students started to deepen their knowledge on the found architectural potentials with the first excercise of the semester, this time with a time frame of one week.